GE C70 Instruction Manual page 625

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CHAPTER 10: MAINTENANCE
(note riveted hinges with red arrows - cannot replace this front panel)
The front panel has been removed.
To install the graphical front panel:
1.
With power to the unit off, screw the left mounting bracket to the outside of the relay. The power supply module can
remain in the first slot.
Figure 10-19: Attach mounting bracket to relay on left side (no power supply module in first slot)
2.
Screw the right mounting bracket to the right side of the relay.
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
REPLACE FRONT PANEL
10
10-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents