Battery Controller Configuration - NEC Express 5800 Series User Manual

Bmc configuration
Hide thumbs Also See for Express 5800 Series:
Table of Contents

Advertisement

BMC Configuration User's Guide
4.4.3

Battery Controller Configuration

This screen displays and sets the various functions of the battery controller.
Item
Battery Controller Configuration
Shutdown at power lost
Shutdown delay time
Battery turn off delay time
Boot after power recovery
Boot timeout after DC-ON
*1: The POWER Switch should be configured to shutdown in the OS.
*2: It is possible to set only if Shutdown at power lost is set to "Enable".
*3: The battery output period may be briefer in duration than the each configured time in this item,
depending on the remaining charge.
*4: This item is valid only when AC-LINK is set 'Stay Off', or AC-LINK is set 'Last State' and Last State is
DC-OFF.
*5: This item is valid at DC-ON after the shutdown system by 'Shutdown at power lost'. (DC-ON by 'Boot
after power recovery' or manually)
Description
Battery Controller setting
Select Enable/Disable of the ability to shutdown
at the power failure. *1
Set the timeout period until the shutdown will be
started at the power failure. *2 *3
Set the timeout period until the shutdown will be
finished at the power failure. *2 *3
Select Enable/Disable of the ability to boot after
the power recovery. *2 *4
Set the timeout period until the boot is complete
after DC-ON. *2 *3 *5
Default Value
Disable
0
0
Disable
0