E Technical Specifications; Cycle Delay Times Of The Plc Caused By Sinec L2 Operations - Siemens SIMATIC S5 Manual

Interface of the programmable controller
Hide thumbs Also See for SIMATIC S5:
Table of Contents

Advertisement

S5-95U, SINEC L2
E
Technical Specifications; Cycle Delay Times of
the PLC Caused by SINEC L2 Operations
Climatic Environmental Conditions
see S5-90U/S5-95U System Manual
Mechanical Environmental Conditions
see S5-90U/S5-95U System Manual
Electromagnetic Compatibility (EMC), Noise Immunity
see S5-90U/S5-95U System Manual
IEC-/VDE Information
see S5-90U/S5-95U System Manual
Internal Technical Specifications
see S5-90U/S5-95U System Manual
Worst Case PLC Delay Time caused by SINEC L2
Operation
- with standard connections
- with PLC to PLC conn. at every L2 FB call 500 to 650 µs*
- with cyclical I/Os when transferring ZP data
at the ZP cycle control point
* depending on the amount of data
Power Supply (Internal)
Input voltage
- rated value
- permissible range
Current consumption from 24 V
- for the S5-95U
- with full ext. I/O configuration
Output Voltage
- V 1 (for external I/Os)
- V 2 (for PG and SINEC L2 interface)
Output Current
- from V 1
- from V 2 (total)
- from V 2 for SINEC L2 interface
Short-circuit protection for V 1, V 2 (PG) yes, electronic
Short-circuit/overvoltage protection
for V 2 (SINEC L2 interface)
Floating
Degree of protection
Back-up battery
see S5-90U/S5-95U System Manual
Data Specific to Onboard I/Os
see S5-90U/S5-95U System Manual
Data Specific to SINEC L2
Main processor
Communications processor
Bus cable
EWA 4NEB 812 6112-02
550 to 650 µs*
400 to 600 µs*
DC 24 V
20 to 30 V
typ.
280 mA
typ.
1.2 A
+9 V
+5.2 V
1 A
0.65 A
0.1 A
yes, fuse
250 mA, quick act.
no
class I
80C537
V25+ with SPC
(Siemens PROFIBUS controller)
two-wire, shielded,
twisted cable
Technical Specifications; Cycle Delay Times
Data Specific to SINEC L2 (continued)
Interface
Transmission type
Transmission protocol
for layers 1 and 2 of the
ISO-7 layer design
Access procedure
- between active stations
- between active and passive stations
Number of stations
- total (active and passive)
- active, max.
- for one segment, max.
Transmission rate
(adjustable in DB1)
SINEC L2 Communications Services
Standard connections
- amount of data per job
- accessible destination address
(for transmitting)
- possible source address
(for receiving)
- broadcast available
PLC to PLC connections
- amount of data per job
- accessible destination address
(for transmitting)
- possible source address
(for receiving)
- broadcast available
Cyclic I/O
- ZP master
- ZP slave
- amount of data for ZPE
- amount of data for ZPA
- accessible destination address
(ZP master, for transmitting) 1 to 126
- possible source address
(ZP slave, for receiving)
- Broadcast available
RS 485
bit-serial
according to
DIN 19245 part 1
token passing, to
DIN 19245, part 1
master-slave, to
DIN 19245, part 1
126
31
31
9.6
kBaud
19.2 kBaud
93.75 kBaud
187.5 kBaud
500
kBaud
1500 kBaud
1 to 242 bytes
1 to 31
1 to 31
yes
1 to 242 bytes
1 to 31
1 to 31
no
yes, for max. 32 ZP slaves
yes
0 to 128 DW (ZP master)
0 to 121 DW (ZP slave)
0 to 128 DW (ZP master)
0 to 121 DW (ZP slave)
1 to 31
no
E-1