Huawei MicroDC3000H Quick Installation Manual
Huawei MicroDC3000H Quick Installation Manual

Huawei MicroDC3000H Quick Installation Manual

Microdc series

Advertisement

Quick Links

MicroDC
Quick Installation Guide
Issue: 02
Release Date: 2014-04-25
MicroDC
Product
Huawei MicroDC implements centralized management of micro data centers in enterprise
branch offices. This solution ensures that the micro data centers operate properly even in
unattended mode, allowing customers to focus on core businesses and processes.
Huawei MicroDC pre-integrates facilities, such as the cabinet cabling subsystem, power
supply and distribution subsystem, and environment monitoring subsystem, and
incorporates the ICT infrastructure, such as computing, storage, network, security, and
voice communication resources. It implements unified, remote management of branch
offices through an open software and hardware platform.
Application Scenarios
 Small-scale branch offices
MicroDC3000L (a 24 U cabinet + optional devices)
 Medium-sized branch offices
MicroDC3000H (a 42 U cabinet + optional devices)
The MicroDC features high scalability. Devices can be easily added
to the cabinet based on service requirements.
More MicroDC cabinets can also be added on demand.
Before You Start

About This Document

a
This document describes how to install MicroDC hardware devices onsite. It does not include the installation of
the devices preinstalled before delivery. For details about the installation for each device, see the documents
delivered with the devices or obtain documents at
How to Obtain Help
b
You can view and download documents from
Feedback
c
Your comments and suggestions help improve the accuracy and quality of our documentation.
Visit
http://enterprise.huawei.com
http://enterprise.huawei.com
http://enterprise.huawei.com
to submit your comments and suggestions.
1
MicroDC3000L 24U
based on the device model.
after registering with this website.
Copyright Huawei Technologies Co., Ltd. 2014. All rights reserved.
MicroDC3000H 42U

Advertisement

Table of Contents
loading

Summary of Contents for Huawei MicroDC3000H

  • Page 1: About This Document

    Release Date: 2014-04-25 MicroDC Product Huawei MicroDC implements centralized management of micro data centers in enterprise branch offices. This solution ensures that the micro data centers operate properly even in unattended mode, allowing customers to focus on core businesses and processes.
  • Page 2: Safety Precautions

    Safety Precautions DANGER Do not operate equipment or cables during lightning strikes.  Ground a device before powering it on. Otherwise, personal injury or equipment damage may be caused by high leakage current.  When installing equipment, ground it first. When removing equipment, disconnect grounding cables last. ...
  • Page 3 MicroDC3000L Quick Installation Guide Start Here...
  • Page 4: Installation Preparations

    1 Installation Preparations Obtaining Tools Mandatory Tools Adjustable Phillips Flat-head ESD gloves Measuring Electrical Diagonal wrench (6'') screwdriver screwdriver tape (5 m) tester pen pliers (M5, M6, and (2 mm to 5 Optional Tools Right angle Level Impact tool Headlamp Niddle-nose Socket Electrician's...
  • Page 5 Understanding Label Specifications  Network cable label Example: Peer device name Sequential number of the network cable 22U-AR1220-FE7 Installation position Port number of the of the peer device peer device 18U-USG-GE0 From: Installation position of the local device Local device name Port number of the local device Label description: The No.7 network cable on the FE7 port of the AR1220 router installed on the 22 U position of the rack is connected to the port GE0 of the USG installed on the 18 U position of the...
  • Page 6 Device Appearances S3700-28TP-SI-AC S3700-28TP-PWR-EI S3700-52P-SI-AC S3700-52P-PWR-EI S2700-26TP-EI-AC S2700-26TP-PWR-EI S5700-28C-PWR-EI S5700-52C-PWR-SI S5700-28C-SI S5700-52C-SI USG2260 Uninterruptible power supply (UPS) Cabinet control unit (CCU) Battery pack...
  • Page 7 AR1220, AR1220V AR1220W, AR1220VW AR2220 RH2285 Filler panel Cable rack Cable tray Ground cable Adjustable guide rails Access point (AP) Dome camera AP power adapter PoE power adapter...
  • Page 8 2 Device Installation and Cable Connection The height of the cabinet is 24 U. Note: U is a unit of measure used to describe the height of devices in a rack. One U is 1.75 inches (44.45 mm) high. The board layout of the MicroDC3000L suite is as follows: Installation position Installation suggestions MicroDC3000L suite...
  • Page 9 Moving the Cabinet (Moving the Cabinet with Devices Using Elevators) Secure the ramp in place. Remove the screws from the cabinet. Use dowels to fix one end of the ramp on the pallet Use an adjustable wrench to turn the four and put the other end on the ground.
  • Page 10: Installing The Cabinet

    Installing the Cabinet Determine the cabinet installation position. Place the cabinet in place. Move the cabinet in place. Determine the position for installing the cabinet based on the engineering drawing. Mark the four corners of the cabinet on the floor. Align the cabinet edges with the marks on the floor Use the powder marker to draw the outline of the using a right square.
  • Page 11: Installing Battery Packs

    Installing Battery Packs Determine installation positions. Due to the limited length of cables, if only one battery pack is required, place it in the position of battery pack 1. Unpack battery packs. Insert a flat-head screwdriver into the gap between the cover and body of the wooden crate, and raise the cover upwards.
  • Page 12 Remove the filler panel. Hold one side of the filler panel with one hand, and hold the buckle on the other side of the filler panel with the other hand, press the buckle with the middle finger, and pull out the filler panel with proper force. Install floating nuts.
  • Page 13: Battery Pack

    Connect the UPS with the battery packs. Battery pack 1 Battery pack 2 Do not connect the plug on the right. Ground battery packs. Insert the ground cables reserved on the ground bar into the binding posts of the three battery packs, and fasten the screws.
  • Page 14 Installing the Server (The RH2285 is used as an example.) Determine the installation position. Remove the filler panel. Install guide rails. Hold one side of the filler panel with one hand, and hold the buckle on the other side of the filler panel with the other hand, press the buckle with the middle finger, and pull out the filler panel with proper force.
  • Page 15: Connect Power Cables

    Connect power cables. NOTE Connect the two reserved power cable connectors on the PDU to the server based on labels. Make sure that the installation position on the label is the same as the server. No ground cable is required because the RH2285 is configured with AC power modules. Connect the switch and the server.
  • Page 16 Installing the KVM Determine the installation position. Remove the filler panel. Hold one side of the filler panel with one hand, and hold the buckle on the other side of the filler panel with the other hand, press the buckle with the middle finger, and pull out the filler panel with proper force.
  • Page 17 Insert rear mounting ears to the rear Use screws to fasten the front mounting mounting ear conduits, and use screws to ears of the KVM to the mounting bars of secure the rear mounting ears to the the cabinet. mounting bars of the cabinet. Connect the KVM to the PDU.
  • Page 18 Securing the Integrated Sensor Mounting Arm Secure the integrated sensor mounting arm using the M5 Phillips screwdriver. Rotate tube 1 to adjust the sensor mounting arm. Adjust the angles of the smoke sensor and the camera using the rotatable connector, and secure the rotatable tube 2.
  • Page 19 Connecting Cables to the Camera • The sensor mounting arm provides a network cable and a signal cable. • The signal cable provides two camera signal cables and two smoke sensor signal cables. • Connect the camera network cable to the PoE power adapter, and connect the camera single cables to the CCU.
  • Page 20: Installing The Ap

    Installing the AP Scenario 1 AP with a power adapter The AP obtains power using the power adapter. Connect the AP to the switch based on the network plan. Switch Connecting the power adapter to a mains power socket Power Network cable adapter Scenario 2 AP without a power adapter...
  • Page 21: Checking The Battery Pack

    3 Inspecting Devices Before Power-On Checking the UPS 1. Check that all bolts are secured for cables. Fasten the bolts that are not properly secured. 2. Check that the voltage between the mains input neutral wire and the ground cable is less than 5 V AC.
  • Page 22 176 V to 264 V AC Maximum input current 16 A Input circuit breaker 16 A/1 P The input ports are chosen based on the country to which the MicroDC is delivered. Specifications of plugs provided by Huawei Performance Socket Product Standards Plug Specifications GB1002...
  • Page 23 Performing Power-On and Power-Off Commissioning Power-on process Power-off process The hardware installation of the MicroDC3000L suite is complete. For Appendix. subsequent operations, see...
  • Page 24 MicroDC3000H Quick Installation Guide Start Here...
  • Page 25 1 Installation Preparations Obtaining Tools Mandatory Tools Adjustable Phillips Flat-head ESD gloves Measuring Electrical Diagonal wrench (6'') screwdriver screwdriver tape (5 m) tester pen pliers (M5, M6, and (2 mm to 5 Step ladder (2 m) Optional Tools Right angle Level Impact tool Headlamp...
  • Page 26 Understanding Label Specifications  Network cable label Example: Peer device name Sequential number of the network cable Installation position Port number of the 22U-AR1220-FE7 of the peer device peer device 18U-USG-GE0 From: Installation position of the local device Local device name Port number of the local device Label description: The No.7 network cable on the FE7 port of the AR1220 router installed on the 22 U position of the rack is connected to the port GE0 of the USG installed on the 18 U position of the...
  • Page 27 Device Appearances S3700-28TP-SI-AC S3700-28TP-PWR-EI S3700-52P-SI-AC S3700-52P-PWR-EI S2700-26TP-EI-AC S2700-26TP-PWR-EI S5700-28C-PWR-EI S5700-52C-PWR-SI S5700-28C-SI S5700-52C-SI USG2260 Battery pack...
  • Page 28 AR1220, AR1220V AR1220W, AR1220VW AR2220 AR2240 RH2285 Power distribution box (PDB) Cable tray Filler panel Adjustable guide rails Cable rack Dome camera Ground cable PoE power adapter AP & AP power adapter...
  • Page 29 2 Device Installation and Cable Connection The height of the cabinet is 42 U. Note: U is a unit of measure used to describe the height of devices in a rack. One U is 1.75 inches (44.45 mm) high. The board layout of the MicroDC3000L suite Installation position Installation suggestions Router...
  • Page 30 Moving the Cabinet (Moving the Cabinet with Devices Using Elevators) Secure the ramp in place. Remove the screws from the cabinet. Use dowels to fix one end of the ramp on the pallet and put the other end of the ramp on the ground. Use an adjustable wrench to turn the four supporting Use an adjustable wrench to remove all screws from feet of the cabinet anticlockwise until the leveling...
  • Page 31 Installing the Cabinet Place the cabinet in place. Determine the installation position of the cabinet. Determine the position for installing the cabinet Move the cabinet in place. based on the engineering drawing. Mark the four corners of the cabinet Align the cabinet edges with the marks on the floor Use the powder marker to draw the outline of the using a right square.
  • Page 32 (Optional) Combine the cabinets. If two or more cabinets are required, these cabinets must be combined. Ignore this operation if only one cabinet is required. Unscrew the connecting plates on the front door There are four connecting points on the front door and rear doors using a Phillips screwdriver.
  • Page 33 Installing Battery Packs Determine installation positions. Due to the limited length of cables, observe the following when installing battery packs: Install battery packs in the following sequence: 7–9 U, 4–6 U, and 1–3 U. • If only one battery pack is required, place it in the position of battery pack 1. •...
  • Page 34 Install mounting ears. Install battery packs in the rack. Place the battery pack on the guide rails, and insert the M6 x 16TM screws into the mounting holes to secure the battery pack to the rack. DANGER The rack must be grounded before you perform 1.
  • Page 35 Connect the UPS with battery packs. Remove the dust-proof protective iron plates from the ports on the UPS and battery packs using a Phillips screwdriver. Connect the UPS and battery packs and secure the connectors using a screwdriver, as shown in the following figure. Battery pack 1 Battery pack 2 Battery pack 3...
  • Page 36 Installing the Server (The RH2285 is used as an example.) Determine the installation position. Remove the filler panel. Install guide rails. Hold one side of the filler panel with one hand, and hold the buckle on the other side of the filler panel with the other hand, press the buckle with the middle finger, and pull out the filler panel with proper force.
  • Page 37 Connect power cables. NOTE Connect the two reserved power cable connectors on the PDU to the server based on labels. Make sure that the installation position on the label is the same as the server. No ground cable is required because the RH2285 is configured with AC power modules. Connect the switch and the server.
  • Page 38 Installing the KVM Determine the installation position. Remove the filler panel. Hold one side of the filler panel with one hand, and hold the buckle on the other side of the filler panel with the other hand, press the buckle with the middle finger, and pull out the filler panel with proper force.
  • Page 39 Insert rear mounting ears to the rear Use screws to fasten the front mounting mounting ear conduits, and use screws to ears of the KVM to the mounting bars of secure the rear mounting ears to the the cabinet. mounting bars of the cabinet. Connect the KVM to the PDU.
  • Page 40 Securing the Integrated Sensor Mounting Arm Secure the integrated sensor mounting arm using the M5 Phillips screwdriver. Rotate tube 1 to adjust the sensor mounting arm. Adjust the angles of the smoke sensor and the camera using the rotatable connector, and secure the rotatable tube 2. Tube 2 Adjustable connector Tube 1...
  • Page 41 Connecting Cables to the Camera • The sensor mounting arm provides a network cable and a signal cable. • The signal cable provides two camera signal cables and two smoke sensor signal cables. • Connect the camera network cable to the PoE power adapter, and connect the camera single cables to the CCU.
  • Page 42 Installing the AP Scenario 1 AP with a power adapter The AP obtains power using the power adapter. Connect the AP to the switch based on the network plan. Switch Connecting the power adapter to a mains power socket Power Network cable adapter Scenario 2 AP without a power adapter...
  • Page 43 3 Inspecting Devices Before Power-On Checking the PDB Testing mechanical performance 1.Switch on and off all circuit breakers three times. Ensure that they can be switched on and off smoothly. 2.Check that all bolts are secured for cables. Fasten the bolts that are not properly secured. 3.Check that screws at the ground point are secured.
  • Page 44 Commissioning Battery Packs 1. Check that all bolts are secured for cables. Fasten the bolts that are not properly secured. 2. Check that the voltage between the positive and negative terminals is greater than 192 V DC. (You are advised to test the insulation performance together with the onsite electricians.) 3.
  • Page 45 4 Performing Power-On and Power-Off Commissioning Connecting the Power Cable of the Cabinet NOTE • The 42 U cabinet connects to the mains supply cable through an industrial connector. • The mains supply cable is prepared by customers based on the electrical specifications of the external mains power distribution system.
  • Page 46 Installing the industrial connector (This operation must be performed by professional electricians onsite.) Loosen component 1 and screw A, remove Pass the cable through component 1 and component 3, and loosen screw B. component 2 to the pressing sheet of component 3 (at the position of screw B).
  • Page 47: Power-On Process

    Loads refer to power consuming devices, such as switches and routers. Power-off process Onsite environment The hardware installation of the MicroDC3000H suite is For details, see Starting and Stopping the UPS Appendix. complete. For subsequent operations, see in Appendix B. P49...
  • Page 48 For details about how to commission the hardware, see the MicroDC V100R001C20 Commissioning Guide. You can obtain the MicroDC V100R001C20 Commissioning Guide from the DVD-ROM delivered with the MicroDC V100R001C20 cabinet or at http://enterprise.huawei.com. (Product Support > Cloud Computing & Data Centers > Data Center > MicroDC > MicroDC) Rapid Deployment 1.
  • Page 49: Starting The Ups

    Starting and Stopping the UPS Symbol description Symbol Description Remarks Choose A. A and B indicate the operators on the UPS control panel. Choose A and then B. Some screens are omitted between the two None screens at both ends of the sign. Starting the UPS Switch off the AC input circuit breaker on the UPS backplane.
  • Page 50 Observe the indicators on the UPS panel. If the indicators 1 and 4 are steady green, the UPS starts properly. After the UPS is running properly, start the loads. Stopping the UPS Switch the UPS from the normal mode to the bypass mode. On the main screen, press on the UPS panel to go to the main menu and choose Shutdown.

This manual is also suitable for:

Microdc3000l

Table of Contents