Connections; Pneumatic Connections; Tubing To Compressed Air Unit; Tubing To Abb Compressed Air Adaptor (Ads430170) - ABB Aztec ADS430 EZCLEAN Operating Instructions Manual

Compressed air supply unit
Table of Contents

Advertisement

4 Connections

4.1 Pneumatic connections

WARNING – Bodily injury
The Aztec ADS430 EZCLEAN system develops
compressed air up to a pressure of 50.7 psi(g) /
3.5 bar(g) maximum (when outlet blocked [zero flow]).
— do not use compressed air for any other purpose
than that for which it is provided
— never direct a stream of compressed air towards
your body or the body of any other person
— when handling / connecting compressed air lines:
— the correct safety procedures must be
observed
— suitable PPE must be worn (goggles / gloves /
overalls)

4.1.1 Tubing to compressed air unit

Referring to Fig. 4.1:
1. Connect one end of the 6 mm OD nylon tubing
bulkhead push-fit connector
Fig. 4.1 Connecting 6 mm OD nylon tubing to the compressed air unit
2. Proceed to:
— Section 4.1.2 to connect 6 mm OD nylon tubing to
ABB compressed air adaptor (ADS430170)
— Section 4.1.3 to connect 6 mm nylon OD tubing
to ABB flowcell (ADS430160)
A
to
B
.
Aztec ADS430 EZCLEAN | Compressed air supply unit | OI/ADS430/EZCLN–EN Rev. B

4.1.2 Tubing to ABB compressed air adaptor (ADS430170)

1. Refer to INF14/158-EN to fit the compressed air adaptor
to the probe.
Referring to Fig. 4.2:
2. Connect the free end of 6 mm OD nylon tubing
B
G3/8 connector
on the compressed air adaptor
WARNING – Bodily injury
Typical pressure and flowrate 20 psi(g) / 1.38 bar(g)
@0.5 scfm (14.16 L/min), set to perform every 4 hours.
Fig. 4.2 Connecting 6 mm OD nylon tubing to the ABB compressed
air adaptor
3. Proceed to Section 4.2, page 10 to make electrical
connections.

4.1.3 Tubing to ABB flowcell (ADS430160)

1. Refer to INF/157-EN to fit the probe into the ABB flowcell.
Referring to Fig. 4.3:
2. Connect the free end of 6 mm OD nylon tubing
B
G3/8 connector
on the ABB flowcell
WARNING – Bodily injury
Typical pressure and flowrate 20 psi(g) / 1.38 bar(g)
@0.5 scfm (14.16 L/min), set to perform every 4 hours.
Sample in
Fig. 4.3 Connecting 6 mm OD nylon tubing to the ABB flowcell – typical
arrangement
3. Proceed to Section 4.2, page 10 to make electrical
connections.
A
to
C
:
A
to
C
:
Sample out
9