Mounting Kits - GE K0470 User Manual

Pace indicators pressure automated calibration equipment
Table of Contents

Advertisement

2 Installation
2.5

Mounting kits

Rack-mount option (Figure 2-5)
There must be enough space at the rear of the instrument for all the cables and pipes. The length
of the cables and pipes must allow for the removal and installation of the instrument. The cooling
air of the instrument must not be obstructed. Allow a free flow of air through the equipment rack
and around the instrument, especially at high ambient temperatures.
Procedure
1.
Locate instrument in rack mount assembly
2.
Secure with the four M3 x 6 screws
3.
Support the instrument and connect the cables and pipes.
4.
Refer to the electrical connections below before fitting the instrument into the
equipment rack.
5.
Temporarily locate the two spigots* to each side of the equipment rack.
6.
Locate and slide the instrument into the rack.
7.
Locate the instrument on the spigots*.
K0470 Revision A
Figure 2-5 Rack-mounting
, (maximum length M3 x 8).
2 - 8
.
[EN] English

Advertisement

Table of Contents
loading

Table of Contents