PACE Pressure Indicators User Manual
4
Maintenance
4.1
Introduction
This section contains procedures for routine maintenance and the replacement of components
(Ref: Testing and Fault Finding, Section 5).
* may change depends on usage (e.g., rack mounted, bench top) and environment (e.g., humidity, dust).
† may change depends on the required accuracy.
4.2
Visual Inspection
Inspect for obvious signs of damage and dirt on the following:
a.
External of the instrument.
b.
Power supply adaptor
c.
Associated equipment.
Damaged parts must be replaced contact GE Service.
For cleaning (Ref: Cleaning Section 4.3).
4.3
Cleaning
CAUTION
Do not use solvents for cleaning.
Clean the front panel with a damp lint-free cloth and mild detergent.
4.4
Test
Do a standard serviceability test (Ref: Standard Serviceability Test, Section 5.2).
4.5
Calibration
The instrument should be returned to the manufacturer or calibration facility, (Ref: Section 6.14).
To find the date of the last calibration, press Measure set-up/Status/Calibration history.
[EN] English
Table 4.1 - Maintenance Tasks
Task
Visual Inspection
Test
Cleaning
Calibration
Period
Before use
Before use
Weekly*
12 months †
4 - 1
K0470 Revision A