Program Installation; Off-Line Startup - NEC NEAX 2400 ICS Installation Manual

Hide thumbs Also See for NEAX 2400 ICS:
Table of Contents

Advertisement

1. Program Installation

Program installation procedure consists of the following steps.
When the system is in redundant configuration, perform system changeover by turning OFF the System 0 and repeat
the above steps.

1.1 Off-Line Startup

START
Set the SENS switch for
the system to be initial-
ized (CPU0, CPU1) to
"c" on the EMA card.
• Turn Power-SW ON.
END
Off-Line Startup
HD Initialization
Basic Software Installation
Standard Service Software Installation
<Status change of 7 Segment LED on the EMA card>
ND-70373 (E)
<Startup end (off-line mode)>
SYSTEM STARTUP
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
CHAPTER 3
Page 19
Revision 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn1433 cpraf-aSn1435 cprah-a

Table of Contents