Environment; Integrating Mobile End Devices With Abb-Welcome Ip-Gateway; System Requirements - ABB 83342-500 Operating Instructions Manual

Ip-gateway
Hide thumbs Also See for 83342-500:
Table of Contents

Advertisement

Operating Instructions
ABB-Welcome
Pos: 10.1 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Überschriften (--> Für alle Dokumente <--)/1. Ebene/U - Z/Umwelt @ 18\mod_1302614158967_15.docx @ 103383 @ 333333 @ 1
3

Environment

Pos: 10.2 /#Neustruktur#/Online-Dokumentation (+KNX)/Sicherheitshinweise und Hinweise (--> Für alle Dokumente <--)/Hinweise/Hinweis - Umwelt - Hinweis Elektrogeräte @ 18\mod_1302763973434_15.docx @ 103500 @ 3333333333333 @ 1
Consider the protection of the environment!
Used electric and electronic devices must not be disposed of with domestic waste.
The device contains valuable raw materials which can be recycled. Therefore, dispose of the
device at the appropriate collecting depot.
Pos: 10.3 /#Neustruktur#/Online-Dokumentation (+KNX)/Sicherheitshinweise und Hinweise (--> Für alle Dokumente <--)/Hinweise/Hinweis - Umwelt - Entsorgung Elektrogeräte @ 20\mod_1325760695972_15.docx @ 136583 @ 3333333333 @ 1
All packaging materials and devices bear the markings and test seals for proper disposal. Always dispose of the
packaging material and electric devices and their components via the authorized collecting depots and disposal
companies.
The products meet the legal requirements, in particular the laws governing electronic and electrical devices and
the REACH ordinance.
(EU Directive 2002/96/EC WEEE and 2002/95/EC RoHS)
(EU REACH ordinance and law for the implementation of the ordinance (EC) No.1907/2006)
4

Integrating mobile end devices with ABB-Welcome IP-Gateway

4.1

System requirements

Note
Please note that the IP gateway must be connected to the router by a LAN cable.
The following system requirements are necessary for smooth operation of the IP gateway:
Components for the IP gateway
The following components are required to operate the IP gateway:
-
A Welcome door entry system including at least one outdoor station and one system controller
-
IP network (should connect mobile devices, must have a WLAN connection)
-
An outdoor station with camera must be integrated for video transmission
As tenants
As tenants, the following come into question for operation with the IP gateway:
-
Tablet PC or similar device with an iOS or Android operating system for the installation of the app with an
Internet connection via 3G/UMTS or WLAN. The data rate (e.g. a flat rate) must allow for Voice-over-IP
("VoIP") connections.
-
Laptop, tablet PC or similar device with an Internet browser for access to myABB-LivingSpace portal at address
https://my.abb-livingspace.com/en/user/login/ and for the configuration of the IP gateway in the home network
Mobile app
If you want to use the Welcome mobile app from the Internet, the following requirements must also be met:
-
DSL-6000 Internet connection or faster
-
Minimum 3G (UMTS) mobile Internet
Note
An Internet connection slower than ADSL 6.000 or 3G/UMTS impairs the quality of video
streaming from the IP gateway to the apps.
Environment
— 7 —

Advertisement

Table of Contents
loading

Table of Contents