Related Documents; Revision Notes; Acronyms And Abbreviations - ABB REB 551-C3*2.5 Installation And Commissioning Manual

Breaker protection and control terminal
Table of Contents

Advertisement

1.4
1.5
1.6
4
Introduction to the installation and
commissioning manual

Related documents

Documents related to REB 551-C3*2.5
Operator's manual
Installation and commissioning manual
Technical reference manual
Application manual
Buyer's guide

Revision notes

Revision
Description
B
Minor updates in chapter:

Acronyms and abbreviations

AC
ACrv2
A/D converter
ADBS
AIM
ANSI
ASCT
ASD
AWG
BIM
BLKDEL
BOM
BR
BS
BSR
BST
BT
Configuring the 56/64 kbit data communication modules / Configuring the
fibre optical modem
Verifying settings by secondary injection / Line differential protection, phase
segregated (DIFL)
Alternating Current
Setting A for programmable overvoltage IDMT curve, step 2
Analog to Digital converter
Amplitude dead-band supervision
Analog input module
American National Standards Institute
Auxiliary summation current transformer
Adaptive Signal Detection
American Wire Gauge standard
Binary input module
Block of delayed fault clearing
Binary output module
Binary transfer receive over LDCM
British Standard
Binary Signal Receive (SMT) over LDCM
Binary Signal Transmit (SMT) over LDCM
Binary Transfer Transmit over LDCM
Chapter 1
Introduction
Identity number
1MRK 505 114-UEN
1MRK 505 116-UEN
1MRK 505 115-UEN
1MRK 505 117-UEN
1MRK 505 113-BEN

Advertisement

Table of Contents
loading

Table of Contents