Introduction to the installation and
commissioning manual
Introduction to the installation and commissioning
manual

About the complete set of manuals for a terminal

The users manual (UM) is a complete set of four different manuals:
Application
manual
The Application Manual (AM) contains descriptions, such as application and functionality de-
scriptions as well as setting calculation examples sorted per function. The application manual
should be used when designing and engineering the protection terminal to find out when and for
what a typical protection function could be used. The manual should also be used when calcu-
lating settings and creating configurations.
The Technical Reference Manual (TRM) contains technical descriptions, such as function
blocks, logic diagrams, input and output signals, setting parameter tables and technical data sort-
ed per function. The technical reference manual should be used as a technical reference during
the engineering phase, installation and commissioning phase, and during the normal service
phase.
The Operator's Manual (OM) contains instructions on how to operate the protection terminal
during normal service (after commissioning and before periodic maintenance tests). The opera-
tor's manual can be used to find out how to handle disturbances or how to view calculated and
measured network data in order to determine the cause of a fault.
The Installation and Commissioning Manual (ICM) contains instructions on how to install
and commission the protection terminal. The manual can also be used as a reference if a periodic
test is performed. The manual covers procedures for mechanical and electrical installation, en-
ergizing and checking of external circuitry, setting and configuration as well as verifying set-
tings and performing a directional test. The chapters and sections are organized in the
chronological order (indicated by chapter/section numbers) in which the protection terminal
should be installed and commissioned.

About the installation and commissioning manual

The installation and commissioning manual contains the following chapters:
The chapter "Safety information" presents warning and note signs, which the
user should pay attention to.
Technical
Installation and
reference
commissioning
manual
manual
Chapter 1
Introduction
Operator´s
manual
en01000044.vsd