Huawei iBAT 2.0-CIM01C2 User Manual page 29

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
(1) Strip the adhesive tape from the BIM
fastener.
3.
Step 2 Install the CIM.
The CIM must be installed 1 meter above the ground to ensure proper wireless
communication between the CIM and the BIM.
Issue 07 (2019-01-02)
Figure 3-4 Securing a BIM
After connecting all power cables to the system, connect the cable to the BIM.
Figure 3-5 Connecting a BIM
Copyright © Huawei Technologies Co., Ltd.
(2) Attach the BIM and press it for more than
10 seconds.
3 Installing Devices
23

Advertisement

Table of Contents
loading

Table of Contents