Replacing A Bim - Huawei iBAT 2.0-CIM01C2 User Manual

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
Step 2 Remove cables from the CIM panel and label each cable.
Step 3 Remove the CIM.
1.
2.
Step 4 Install the new CIM.
1.
2.
Step 5 Connect the cables to the new CIM based on the recorded information.
Step 6 After the installation is complete, set parameters and network the CIM again.
----End

9.3.2 Replacing a BIM

Prerequisites
Procedure
Step 1 On the iBOX WebUI, choose Monitoring > iBOX System > Running Control > Net Join
Config, select Replace an iBAT from the Operation Type drop-down list box.
Figure 9-1 Net Join Config
Issue 07 (2019-01-02)
If the CIM is damaged, hold down the networking switches on all the BIMs managed by
the CIM to clear present network parameters.
If the CIM is not damaged, hold down the CIM networking switch to clear present
network parameters.
Remove the CIM from the fastener.
Record the DIP switch address of the CIM.
Clamp the CIM to the fastener.
Set the DIP switch for the CIM based on the recorded information.
The iBAT needs to be replaced.
A spare iBAT of the same model is available and functional.
An iBAT needs to be replaced when it is faulty or fails in communication. If multiple
iBATs need to be replaced, replace them in ascending order of the corresponding battery
numbers (range 1–300).
If the replaced iBAT spare parts is iBAT 3.0, you need to upgrade the iBOX software to
V296B020 or later versions.
Copyright © Huawei Technologies Co., Ltd.
9 Maintenance
68