Data Migration; Storage Migration; Figure 69 Storage Migration - Fujitsu ETERNUS AF250 Design Manual

All-flash arrays
Hide thumbs Also See for ETERNUS AF250:
Table of Contents

Advertisement

1.
Function

Data Migration

Data Migration

Storage Migration

Storage Migration is a function that migrates the volume data from an old storage system to volumes in a new
storage system without using a host in cases such as when replacing a storage system.
The migration source storage system and migration destination ETERNUS AF are connected using FC cables. Data
read from the target volume in the migration source is written to the migration destination volume in the ETER-
NUS AF.
Since Storage Migration is controlled by ETERNUS AF controllers, no additional software is required.
The connection interface is FC. In addition, the direct connection and switch connection topologies are suppor-
ted.
Online Storage Migration and offline Storage Migration are supported.
Offline method
Stop the server during the data migration. Host access becomes available after the data migration to the mi-
gration destination volume is complete. Therefore, this method prevents host access from affecting the ETER-
NUS AF and can shorten the time of the migration. This method is suitable for cases requiring quick data mi-
gration.
Online method
Host access becomes available after the data migration to the migration destination volume starts. Operations
can be performed during the data migration. Therefore, this method can shorten the time for the stopped op-
eration. This method is suitable for cases requiring continued host access during the data migration.

Figure 69 Storage Migration

The source storage system
The Storage Migration function migrates whole volumes at the block level. A data migration can be started by
specifying a text file with migration information that is described in a dedicated format from ETERNUS Web GUI.
The path between the migration source and the migration destination is called a migration path. The maximum
number of migration volumes for each migration path is 512.
Up to 16 migration source devices can be specified and up to eight migration paths can be created for each mi-
gration source device.
The capacity of a volume that is to be specified as the migration destination area must be larger than the migra-
tion source volume capacity.
FC
Storage Migration
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Design Guide (Basic)
Copyright 2019 FUJITSU LIMITED
ETERNUS AF
108
P3AG-1822-09ENZ0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus af250 s2

Table of Contents