Download Print this page

Sealey GSS2323 Instructions Manual page 14

Galvanized shed 2.3 x 2.3 x 1.9m
Hide thumbs Also See for GSS2323:

Advertisement

GardenShed
Step 5:
Assemble the front wall panels
Step 5: Assemble the front wall panels.
Fix parts 41J and 41K (jamb) to parts 11P and 11Q (sheeting) with self tapping screws as per diagram below. Note: All screws marked with a
Fix parts 41J and 41K (jamb) to parts 11P and 11Q (sheeting) with self-tapping screws as per diagram below. NOTE: All
cross should not be fixed at this stage. Make sure the small lip on the channel is always facing out. This ensures the rainwater can not build up
screws marked with a cross should not be fixed at this stage. Make sure the small lip on the channel is always facing out.
inside the shed.
This ensures rain water cannot build up inside your shed.
ROOF TOP EDGE
ROOF TOP EDGE
Fix parts 26P, 26N (top channels), 26L, 26M and 23A (bottom channel) with self tapping screws. Enhance the top channels by applying part 66
(channel connector).
Fix parts 26P , 26N (top channels), 42A (jamb), 26L, 26M, and 23A (bottom channels) with self-tapping screws. Enhance
the top channels by applying part 66 (channel connector).
© Jack Sealey Limited
2.3 x 2.3 x 2.4m
41K
41J
11P
42A
26P
11P
Original Language Version
11Q
RIDGES FACING UP
26N
66
11Q
23A
26L
RIDGES FACING UP
26M
23A
26M
26L
GSS2323/G | Issue:2(SP) 13/04/17

Advertisement

loading

This manual is also suitable for:

Gss2323g