Download Print this page

Sealey GSS2323 Instructions Manual page 19

Galvanized shed 2.3 x 2.3 x 1.9m
Hide thumbs Also See for GSS2323:

Advertisement

Step 6: Assemble the front door continued
Step 6:
Assemble the front door (continued)
Fit part 5K (assembled door) to the front wall panel as per the diagram below. Use a rivet gun to fix to the door using the pre-drilled holes. Fix
the pad bolt (but NOT its keeper at this stage) using the pre-drilled holes with self tapping screws or the rivets provided (see diagram A and B
below).
Fit part 5K (assembled door) to the front wall panel as per the diagram below. Use a rivet gun to fix the door using the pre-drilled
holes. Fix the pad bolt (but NOT its keeper at this stage) using the pre-drilled holes with the self-tapping screws or the rivets provided
(see diagram A and B below).
A
A
© Jack Sealey Limited
ROOF TOP EDGE
70
Original Language Version
BACK
RIDGES FACING DOWN
5K
FIX PAD BOLT WITH
B
B
3.0 X 10MM RIVETS
FIX DOOR HINGES
4.0 X 10MM RIVETS
70
GSS2323/G | Issue:2(SP) 13/04/17

Advertisement

loading

This manual is also suitable for:

Gss2323g