Cushioning Material For Transportation; Procedure For Removing The Cushioning Material For Transportation - Fujitsu Storage ETERNUS LT140 User Manual

Tape library
Hide thumbs Also See for Storage ETERNUS LT140:
Table of Contents

Advertisement

Chapter 2 LT140 Installation

2.2 Cushioning Material for Transportation

2.2
Cushioning Material for Transportation
Cushioning material is placed in Base Modules to prevent the robot from being damaged.
Remove the cushioning material from the inside of the Base Module prior to installation.
Powering on the LT140 without removing the cushioning material may cause failures.
Keep the removed cushioning material in a safe place to reuse when relocating the LT140.
2.2.1

Procedure for Removing the Cushioning Material for Transportation

Procedure
1
Removing the top board.
1-1
Push the locking mechanism on both sides at the front of the Base Module into the LT140 to release
the lock securing the top board.
-
-
The specialized tool for releasing the lock is not provided with the LT140.
Push
FUJITSU Storage ETERNUS LT140 Tape Library User's Guide -Site Planning-
To release the lock, use a tool with a metal point, such as a flathead screwdriver and a Hex Key.
A tool with a 2 – 4mm point is ideal for releasing the lock.
Tool
Lock mechanism (left side)
Copyright 2018 FUJITSU LIMITED
Top board
Lock mechanism (right side)
18
Tool
Enlarged view of the lock
mechanism (right side)
Push
P3AG-3712-01ENZ0
Push

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents