Huawei PowerCube 500 V200R001C10 Quick Manual page 6

Hide thumbs Also See for PowerCube 500 V200R001C10:
Table of Contents

Advertisement

3. Install the function module
hanging kit.
6. Install a lithium battery.
10.2
(Optional) Installing the Function Module and Lithium Battery on a Wall
The wall must be made of reinforced concrete and be able to bear at least 800 N. The wall must not be damaged if subject to a tension of
1.25 kN exerted outwards vertical to the wall.
Space Planning
4. Install a function module.
7. (Optional) Install the second lithium battery.
NOTE
If two lithium
batteries are required,
install one above the
other. Install the pole
mounting kit after
using a positioning
sticker at the cable
hole in the upper part
of the pole to mark its
installation position.
For the method, see
steps 1 and 2.
Unit: mm
6
5. Install the lithium battery hanging kit.
The option to
install a lithium
battery
depends on
the scenario.
No lithium
battery is
required in the
grid-only
scenario.
Installation Procedure
1. Remove wall mounting kits A and B.
Wall mounting
kit A
Wall mounting
kit B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ar550cx-300h1Ar550cx-300g1

Table of Contents