8
Installing a Lightning Rod
Grid Hybrid Scenario
Solar Hybrid Scenario
9
Installing an Antenna
For the antenna installation method, see the antenna document.
10
Installing the Function Module and Lithium Battery
Wear protective gloves during installation.
Do not place a module with its bottom against the ground.
Never install a module with power on. Ensure that the angle between a module and the line vertical to the ground is within 10 degrees.
The paint on the module exterior should be intact. If paint has flaked off, repaint the area to avoid corrosion.
Installing the Function Module and Lithium Battery on a Pole
10.1
2. Install the pole
1. Use a positioning
mounting kit.
sticker to mark the
installation position for
the pole mounting kit.
Positioning
sticker
Cable hole
Ensure that the arrow on the top of the pole mounting kit points exactly to the middle
point on the top of the positioning sticker.
There are three types of bolts available for installing the pole mounting kit. Choose
the appropriate type of bolts based on the pole diameter.
Pole Diameter
(105–140 mm)
Bolt (120 mm)
5
Adjust the tilt angle of the lightning
rod based on the site latitude.
Site
Latitude
0–15°
16–25°
26–30°
31–45°
Pole Diameter
Pole Diameter
(140–175 mm)
(175–210 mm)
Bolt (160 mm)
Lightning Rod
Tilt Angle
15°
25°
35°
45°
Bolt
(190 mm)