Receiving, Placing And Connecting; Receiving The Cabinet; Unpacking Cabinet, Mounting Preparations; Unpacking - ABB Terra 54 Series Installation Manual

54hv charger
Hide thumbs Also See for Terra 54 Series:
Table of Contents

Advertisement

5

Receiving, Placing and connecting

5.1

Receiving the cabinet

The product is delivered by a transport company to a warehouse where it will be handed over.
Transporting the T54 to its final location (last mile service) is not standard included in the or-
der.
Check whether the Terra 54 has not been shaken or tilted.
The cabinet is equipped with Shockwatch and Tiltwatch indicators.
Checking the Shockwatch and TiltWatch PLUS sensors:
If the ShockWatch indicator is red, or the TiltWatch PLUS indicator is tilted over 30°:
1.
Do not refuse the delivery / receipt.
2.
Make a notation on the delivery receipt and inspect cabinet for damage.
3.
If damage is discovered, leave cabinet in original package and request immediate
inspection from carrier within 3 days of delivery.
4. Contact ABB The Netherlands by mail (service.evci@nl.abb.com) or phone (+3170
3076 201) to notify us about your findings.
5.2

Unpacking cabinet, mounting preparations

5.2.1

Unpacking

The packaging of the Terra 54 can be removed without the use of tools.
2 0 18 - 10 - 03
NOTICE
The delivery truck unloads the pallet carrying the Terra 54.
The movement of the Terra 54 to its final location is the re-
sponsibility of the customer / contractor.
TER R A 54 / 54 H V C H AR G ER
2 2 /40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra t54 cTerra t54 cjTerra t54 cjgTerra t54 ctTerra t54 c hvTerra t54 cj hv ... Show all

Table of Contents