Add a picture of the surrounding of the charger, upload the local CAF document A4
on the page of the charger in PDF
•
Change Deliver status to <SAT>.
After completing the Site Acceptance Test, ABB's Network Operation Center will be triggered
to perform a final check on the connection and configuration of the charger.
Upon approval the charger will be operational and initialized for use.