Table of Contents

Advertisement

3.4 Wiring

(1) Wiring for 10BASE-5
12 VDC Connect with the mount base
FG terminal.
This hardware unit may malfunction if it is connected poorly or has a broken
line. After connecting the 10BASE-5 connector, check whether the locking
post is locked by the retainer.
Do not touch the 10BASE-5 connector during power-on. Otherwise, the
system may malfunction due to static electricity, etc.
SV.LINK
LQE521
MODU
TX
RX
No.
ERR
10BASE
-5
10BASE
-T
12V
GND
FG
Retainer
Lock post
Connector at the
module side
Insert the communication cable into
the 10BASE-5 connector.
10BASE-5 communication cable
Push up the retainer to
the arrow direction and
insert the connector.
Connector at
the cable side
NOTICE
3-5
3 MOUNTING AND WIRING
After inserting the connector,
push down the retainer to the
arrow direction.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lqe521S10miniS10v

Table of Contents