Download Print this page

Huawei OptiX OSN 6800 Quick Installation Manual page 33

Intelligent optical transport platform, n63b cabinet
Hide thumbs Also See for OptiX OSN 6800:

Advertisement

c
Installing and Routing Power Cables
WARNING
Do not install or remove power cables while the equipment is powered on. Ensure that the power is switched off prior
to removing or installing a power cable to avoid bodily injuries.
1
1
Remove the subrack cover.
4
4
Bundle the power cables (if there
is no outside fiber winding
direction, just bundle cables in
the inside one).
2
2
Plug the end (with DB3
connector) of the power cable
into the PIU board and tighten
the screw.
5
5
Restore the subrack cover
back to the original position.
30
Cable tie
Diagonal pliers
Phillips screwdriver
3
3
Route power cables
connected to the subrack.
6
6
The power cables have
been installed.

Advertisement

loading