Download Print this page

Installing Boards - Huawei OptiX OSN 6800 Quick Installation Manual

Intelligent optical transport platform, n63b cabinet
Hide thumbs Also See for OptiX OSN 6800:

Advertisement

2 Installing Boards

NOTE
Wear an ESD strap whenever coming into contact with a metal component of the equipment.
CAUTION
1. Before installing a board, verify that board connectors have no scratches,
holes, or damage, the backplane has no bent pins, and the plastic cover of the
48 V power connector is not detached. If an abnormality is found, contact
Huawei engineers for help.
2. Handle boards gently to avoid damage to board connectors.
Inserting a board
1
1
1
Pinch the upper
2
side (the side with
an arrow) of the
blank filler panel.
Removing a board
1
1
Hold the ejector
2
levers outwards.
3
2
Remove the blank
filler panel.
2
Remove the
Insert the guide strip on the lower side
board.
(without an arrow) of the blank filler
panel to the sliding guide of a vacant
slot, and make sure that the ejector
level is locked to the occlusal notch of
the subrack.
4
Insert the board.
Push the ejector
levers inwards.
4
3
6
1
Push the upper side (the side
with an arrow) of the blank filler
panel to the subrack. The blank
filler panel is properly installed if
a snap is heard.

Advertisement

loading