Procedure For Connection To Communication System - Siemens 3VF Series Communications Manual

Table of Contents

Advertisement

Communication System Manual

4.3 Procedure for connection to communication system

3WN1/3WS1 circuit-breakers are connected to PROFIBUS-DP in 8 steps:
Step 1: Check that all the system components are fitted
Step 2: Check the system requirements
Step 3: Connect the I/O module
Step 4: Connect 3RK1002 interface module to PROFIBUS-DP
Step 5: Connect 3RK1002 interface module to 3WN1/3WS1
Step 6: Connect 3RK1002 interface module to voltage supply
Step 7: Bus configuration
Step 8: Set bus address on 3RK1002 interface module
Step 1:
Check that all the following system components are fitted before connecting 3WN1/3WS1 to
PROFIBUS-DP:
Communication-capable 3WN1/3WS1 circuit-breaker
3RK1002 interface module and connecting cable from 3RK1002 interface module to circuit-
breaker (supplied with 3RK1002)
Connector (6ES7xxx) including terminating resistor for connecting interface module to
PROFIBUS-DP
24 V DC voltage supply (DIN 19240)
Diskette with type or GSD file (supplied with 3RK1002)
I/O module (e.g. ET 200 U)
Programming device PG ... (for SIMATIC S5/S7, or other appropriate hardware)
COM ET 200 software/COM-PROFIBUS (for SIMATIC S5, or other appropriate software)
56)
This procedure must be performed for each individual 3WN1 circuit-breaker.
82
Check that all the system components are fitted
© Copyright Siemens AG 1998. All rights reserved.
3WN1, 3WS1 Circuit-Breakers
56
Version 1.0 (08/98)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents