Checking Before Installation; Checking Power Supply; Checking The Installation Environment; Checking The Installation Space - Canon imageRUNNER ADVANCE C5500 Series Service Manual

Hide thumbs Also See for imageRUNNER ADVANCE C5500 Series:
Table of Contents

Advertisement

Checking before Installation

Following shows requirements for the installation site.
Therefore, it is desirable to see the installation site in advance
before bringing in the machine to the user's site.

Checking Power Supply

1. There must be a properly grounded source of power
that can be used exclusively by the following
machines:
• USA: 120V-127V/16A
• EUR/ASIA/CHINA/KBS: 220-240V/10A
• TW: 110V-120V/16A
Checking the Installation
Environment
1. The environment of the installation site must be in
the range as shown below. Avoid installation near
the faucet, water boiler, humidifier or refrigerator.
• Guaranteed range for operation/image
Temperature: 10.0 to 30.0 deg C, Humidity: 20 to
80%
2. The machine must not be installed near a source of
fire or in an area subject to dust or ammonium gas.
If the area is exposed to direct rays of the sun,
provide curtains to the window.
3. Be sure to provide adequate ventilation of the room
to keep the work environment comfortable. Room
odor can be bothering when running the machine for
a long time in a poorly-ventilated room although the
ozone amount generated while running this
equipment does not harm human health.
Checking the Installation
Space
1. Be sure that the feet of this machine are properly set.
In addition, be sure to keep the machine horizontal.
2. Be sure to keep 100 mm or more distance from the
wall to make enough room for performing the
operation.
• When option is not installed
4" (100 mm) or more
19 3/4"
(500 mm)
or more
• Booklet Finisher-Y1 + Paper Deck Unit-F1 is
installed
19 3/4"
(500 mm)
or more
3. To install the host machine, install it in a well-
ventilated place. Especially when there are multiple
host machine s, be sure to locate the machine where
the machine is free from direct exhaust of other
machines. Be sure to keep the machine away from
the air-inlet duct which is used for ventilation of the
room.
Points to Note before
Installation
When installing the machine, be sure to note the following
points.
1. When the machine is moved from a cold location to
a warm location, condensation may occur resulting
in water drops on the metal surfaces. Use of the host
machine when there is condensation may result in
image failure. After moving the machine from a cold
location to a warm location, leave it unpacked for at
least 2 hours or more to let it warm up to room
temperature before installation.
1101
9. Installation
(500 mm)
82 3/4" (2,100 mm) or more
4" (100 mm) or more
126 " (3,200 mm) or more
19 3/4"
or more
19 3/4"
(500 mm)
or more