Mitsubishi Electric MELSEC iQ-R Series User Manual page 33

Bacnet module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Setting objects and properties
Before setting a BACnet module, stop the operation of the module.
For details on the settings for objects and properties, refer to the following manual.
MELSEC iQ-R BACnet Module User's Manual (Application)
■Stopping an operation
The following shows how to stop the operation of a BACnet module.
Operating procedure
1.
Select [Maintenance]  [Pause/Restart], and click the [Pause] button in the "Pause/Restart" screen.
2.
Read the displayed message, and click the [OK] button.
The background of the screen changes from blue (in operation) to yellow (pause).
■Applying settings
The following shows how to apply settings to a BACnet module.
Operating procedure
Reset the CPU module, or turn the power OFF and ON to apply the settings.
4 PROCEDURES BEFORE OPERATION
4.2 Configuring Settings Using a Web Browser
4
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rj71bac96

Table of Contents