System Configuration Table - Toshiba BMS-TP0640ACE Manual

Touch screen controller, tcs-net air conditioning control system
Table of Contents

Advertisement

System Configuration Table

Touch Screen Controller
Air conditioning monitoring/control
Energy monitoring and billing
Indoor units connected
Intelligent Server
Intelligent Server Software
TCS-NET Relay I/F
Energy Monitoring Relay I/F
Digital I/O Relay I/F
Switching HUB
Ethernet wire
PC
Power meter
*1:The number of ethernet wires and the number of switching HUB port vary with the number of Intelligent Server connected.
*2:100 BASE-T compliant is required in using 5 or more server, or 2 or more controllers.
*3:The number of power meters vary with power meter specifications.
• Two or more refirgerant system can be connected to one power meter.
• For heat recovery VRF (SHRM) and "Super digital inverter", "Digital inverter", it is necessary to install the power meter
independently.
• All power meters connected same controller must be set same pulse generator constants.
BMS-TP0640ACE BMS-TP0640PWE BMS-TP5120ACE BMS-TP5120PWE
BMS-LSV2E
BMS-STCC01E
BMS-IFLSV1E
BMS-IFWH3E
BMS-IFDD01E
Procured on site
Procured on site
Procured on site
Procured on site
(× ... available – ... not available)
×
×
Max. 64 units
1 unit
1 unit
Max. 8 units
Max. 4 units
Max. 4 units
Comply with 10BASE-T*
*
Number of ports: As required
1
Category 5 UTP straight wire
OS: Windows 2000 or later, Excel 2000 or later
*
Pulse output type
3
Pulse generator constants:
1 kWh/pulse or 10 kWh/pulse
Pulse duration: 50 - 1000 ms
Output terminal: ON/OFF contactor
19
×
Max. 512 units
Max. 4 units
1 unit per Intelligent Server
(max. 4 units in total)
Up to 8 units per Intelligent Server
(max. 32 units in total)
Max. 4 units
Max. 4 units
2
×