Mitsubishi Electric C Series Handling And Maintenance page 62

Moulded case circuit breakers, earth leakage circuit breakers, earth leakage relays & circuit protectors
Table of Contents

Advertisement

(b) Operation circuit connection
(i) Connect the operation power supply to the operation power supply terminals (P1 and P2).
There is no polarity.
(ii) Connect ON switch and OFF switch to the operation switch terminals (S1, S2 and S4). For the
operation switches, use the micro-loading switches (with approx. DC 24 V, 30 mA of switching
capacities) prepared at your side.
Note: For the voltage sharing items, the rush current (capacitor charging current 60A 1msec) men-
tioned later flows to the breaker and the fuse in the power supply circuit. So select the items
with care to prevent fusion and operation errors.
Operating
Uc
power supply
(c) Caution on withstand voltage tests
The withstand voltage between the operation circuit terminals (P1, P2, S1, S2 and S4) and the
ground is AC 1500 V.
Power supply module
P1
P.S
Power
Supply
P2
X
S1
S2
ON
S4
OFF
(RESET)
The breaker indicates OFF and the electric operation
unit is Charged.
Electric operation base
K3
SW1
K2
K3
M
SW2
K2
K3
K1
K2
K1
K1
P.S
Switching power supply (AC 100-240 V/DC 100-250 V types only)
SW1
MANU/AUTO selector switch
SW2
Charge/Discharge detecting switch
M
Motor
K1
Relay (for OFF switch)
K2
Relay (for the motor)
K3
Relay (for the motor)
X
Pumping preventive circuit
60