Parameters Settings; Energy Control; Grid-Tied Point Control - Huawei SUN2000-2KTL-L1 User Manual

Hide thumbs Also See for SUN2000-2KTL-L1:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual

7.2 Parameters Settings

Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar APP and SUN2000 App User Manual
to obtain the document.

7.2.1 Energy Control

On the home screen, tap Power adjustment to perform the corresponding
operation.
Figure 7-9 Energy control

7.2.1.1 Grid-tied Point Control

Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the power deviation limit.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
Figure 7-10 Grid-tied point control
Issue 04 (2021-04-01)
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
B Device
Commissioning.
. You can also scan the QR code
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents