Protection relay
Check the connection status of protection relays via PCM600. Open the factory delivered pro-
ject and select the protection relay for which you want to check the connection. If the connec-
tion between the PCM600 and protection relay is established, a green tick mark is shown
next to the protection relay icon.

Figure 24: Example of Plant Structure in PCM600

Network redundancy
Check the availability of voltage measurements and GOOSE signals when the managed Ether-
net switch, communication link or protection relay fails.
GOOSE and Process bus
The GOOSE / SMV alarm is assigned to a configurable LED via the PCM600 and it relates to
function blocks (GSELPRT1 – GOOSE supervision and ULTVTR1 – SMV supervision).