AP PAR ATU S CO NTR O L T E S TI NG
Step 6/10
On the protection relay LHMI (tested feeder) go to -> Main Menu/Test/Function tests/
Other protection
– CCBRBRF1 = Activate TRBU (backup trip logic output)

Figure 76: Activating backup trip

The Incomer and Bus tie circuit breakers must trip immediately.
Then
On the protection relay LHMI (tested feeder) go to -> Main Menu/Test/Function tests/
Other protection
– CCBRBRF1 = Deactivate TRBU

Figure 77: Deactivating backup trip

1 VLG 500 0 17 C
I NT ER LO C K S BE T W EE N PA NE LS
51