Figure 36: Measurements View - ABB UniGear Digital Commissioning And Testing Manual

Hide thumbs Also See for UniGear Digital:
Table of Contents

Advertisement

PR IM AR Y T ES T IN G
Step 6/6
Check current metering for the phase and the measured current in other phases on the pro-
tection relay LHMI Measurements view.
Current must be zero in all phases which are not under the primary injection test.

Figure 36: Measurements view

"Io-A" in Measurements view is a measured value, not a calculated one.
1 VLG 500 0 17 C
CU R R E N T S EN SO R S
2 5