Huawei NetCol5000 C030H6B20 10020E1 Quick Manual page 7

In-row chilled water smart cooling product
Table of Contents

Advertisement

2. Level the cabinet.
Anchored installation with a base
1. Level the cabinet on the base.
3. Install the air baffle.
NOTE
Conversion bracket is no use when it is non-
anchored installation on an ESD floor.
2. Fasten the cabinet to the base and install
conversion bracket and air baffle.
NOTE
Obtain the screws for securing the equipment
to the base from the fitting bag.
7
M10x25 (4 PCS)
30 N•m

Advertisement

Table of Contents
loading

Table of Contents