Download Print this page

Huawei FusionDC1000A Quick Manual page 19

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:

Advertisement

No.P007
Lithium Battery Cabinet Battery Module and Cable Installation Diagram 1
Step 1: Pull out the battery control unit
for about 10 cm.
Step 2: Install the battery modules
and covers.
Step 3: Remove the front covesr of the battery modules
and install the battery baffle panels.
Step 4: Install battery communications cables.
1. Connect communications cables between battery modules.
2. Connect the communications cable between the battery module
and the battery control unit (reserved in the lower right corner of the
cabinet).

Advertisement

loading