8.2.3

Maintenance Level 6

Installation Manual, CLSC004enI3c
© Siemens AG 2010 / Date of issue: 2010-05-19
Deactivating Maintenance Level 5
Remove any tools and equipment which have been used.
Reconnect the power supply.
If necessary, switch on deactivated components, such as the UPS,
printers and computers, separately.
Activating Maintenance Level 6:
Switching off the power supply for the Colour Letter Scanner
Note!
For additional safety procedures refer to the "lock-out - tag-out"
procedure as described in the respective document from CPC.
Stop the machine and secure it against accidental start-up.
Switch off the power supply for the CLSC and secure it against
accidental start-up.
For details refer to the respective machine documentation or drawing.
The power supply to the CLSC is disconnected; the other
assemblies in the machine may remain energized.
Ensure that voltage is no longer present after the circuit breakers and at
your work place.
For details refer to the respective machine documentation or drawing.
Deactivating Maintenance Level 6
Remove any tools and equipment which have been used.
Switch on the power supply for the CLSC.