Installing The Equipment - Huawei NetCol5000-C030 Quick Manual

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C030:

Advertisement

Cables
Engineering
Procurement
Others
2.1
Preparing an Indoor Unit Base
1. Shock absorption bars (EPDM rubber, 5 mm
thick) need to be installed between the
ground and the base.
2. The base should be at least 250 mm in height.
3. You are advised to use angle steel, square
steel or channel steel. Width of 50 mm and
thickness of 3 mm to 5 mm is recommended.
4. When the width of angle steel is more than 50
mm, it is interfering with the cable routing
holes. Cut out the part on the angle steel to
avoid interfering. If the width is less than or
equal to 50 mm, skip this step.
2.2
Making Holes on the Floor
Front door
(1) Power cable hole, Φ 43mm
(2) Signal cable hole, Φ 43mm
(Top view of the top plate)
3

Installing the Equipment

1. Read the related user manual or instructions before installing the NetCol5000-C.
2. The unit in this document is a fully configured NetCol5000-C. If some components are not
configured, skip the corresponding steps.
3. You are recommended to use tools that are fully insulated when installing devices.
4. Only engineers from the manufacturer or engineers certified by the agent are allowed to install,
commission, and maintain smart cooling products. Otherwise, personal injuries and device
damage may be caused, which is beyond the smart cooling product warranty range.
Power cable (3x2.5 mm² ), teamwork networking and monitoring
cables, and equipotential cable (≥ 16 mm²)
Indoor unit base, thermal insulation foam, and thermal insulation
foam glue
Front door
2
(Side view)
(Front view)
(Top view)
(1) Drainpipe hole, Φ 43 mm
(2) Humidifier water inlet pipe hole,
Φ 43 mm
(3) Ground cable hole , Φ 28 mm
(4) Chilled water outlet pipe hole,
Φ 54 mm
(5) Chilled water inlet pipe hole, Φ
54 mm
(Top view of the bottom plate)