Re-Commissioning After A Standstill Period; Adjusting Lifting Speed - Bosch Rexroth HQ 2/C-H Assembly Instructions Manual

Hide thumbs Also See for Rexroth HQ 2/C-H:
Table of Contents

Advertisement

Please note:
• Mount the corresponding
WT workpiece pallet before
confi guring the lifting
speed (operating load).
• Try to confi gure the HQ to
lift evenly and smoothly.
Throttle the supply
air evenly using both
throttles to adjust the
lifting speed.
• Rotate in the "+" direction
The movement is slower.
• Rotate in the "–" direction
The movement is faster.

8.3 Re-commissioning after a standstill period

Follow the steps outlined for initial commissioning.

8.4 Adjusting lifting speed

Sudden movements
Risk of serious injury or death.
Final commissioning may only be performed with protective devices in place.
These must be provided and installed by the customer.
X
-
+
Fig. 23:
Adjusting lifting speed (HQ 2/C-H shown)
3 842 358 792/2016-12, Material and information fl ow technology: HQ 2/C-H, HQ 4, Bosch Rexroth AG
Commissioning
WARNING
39/64
Y
551 261-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth hq 43 842 999 0023 842 998 035

Table of Contents