Please note:
• Mount the corresponding
workpiece pallet WT (load)
before setting the lifting
speed.
• During configuration, aim
at an even and smooth
lifting movement of the
HQ ....
Throttle the extract air
evenly using both throttle
check valves to adjust
the speed of the lifting
movement.
• Rotate in the "+" direction
The movement is slower.
• Rotate in the "–" direction
The movement is faster.
8.3 Re-commissioning after a standstill
Follow the steps outlined for the initial commissioning.
8.4 HQ, setting the lifting speed
Sudden movements
Risk of severe injury or death.
Final commissioning may only be performed with protective devices in place.
These must be provided by the customer.
X
-
+
Fig. 30:
HQ 2/G-H, adjusting the lifting speed
3 842 564 989/2022-06, MIT: HQ 2/G-H, BS 2/G-250, Bosch Rexroth AG
Commissioning
WARNING
49/84
Y
564 988-53