Auxiliary equipment

14 Maintenance work

14.1 General information

Poor maintenance causes
• faults,
• possibly failure and
• high repair costs.
If during operation or testing irregularities, deviations, faults or wear is noted,
adhere to the following in all cases:
Immediately take the training system out of operation.
Investigate the cause and repair the defects.
Replace the defective component.
Do not put the WS502 training system back into operation.

14.2 Maintenance schedule

The following table lists the jobs, first by the maintenance intervals and then by
assemblies/components. Maintain the intervals.
When?
What?
Daily/
EMERGENCY OFF
before each
button
use
Weekly
Control cabinet
Monthly
Cleaning
or
as
necessary
In line with
The entire electrical
the
installation
company
rules
WS502 training system maintenance schedule
Tabelle 9:

14.2.1 Operating materials, auxiliary materials, tools, measuring

instruments

The following are required to work on the WS502 training system:
• Protective work clothing according to regulations
• Cleaning and care products: cleaning cloths
• Test and maintenance log, writing device
Bosch Rexroth AG
Where?
Comments
Check functioning.
In case of malfunction:
Check effect when
Put the system into
pressing; no start-up
standstill.
during unlocking
Inform a qualified
electrician!
Check all functions:
If necessary, arrange
fuses, RCD protection
for the replacement of
socket-outlets
defective parts.
buttons
Replacement only by
qualified electricians!
Light barriers, cube
Clean with a slightly
storage,
damp cloth.
control sensor robot
gripper
Is the protective
Testing only by a
conductor test valid?
trained electrician!
Is it marked?
61/64
Maintenance work

Advertisement

Table of Contents
loading

Table of Contents