LG CordZero A9 Owner's Manual page 17

Hide thumbs Also See for CordZero A9:
Table of Contents

Advertisement

Available languages

Available languages

4
Slide the detachable nozzle storage d or
detachable nozzle and mop pads storage e
onto the floor stand pipe.
• This accessory is only available on some
models.
• Attach the detachable mop pads storage
f module onto the detachable nozzle
storage module, if they did not come
pre-assembled. Once assembled, the
two modules may be difficult to be
disassembled.
• Make sure not to pinch or tangle the power
cord behind the mop pads storage.
5
Assemble the charging station g onto the top
of the floor stand pipe.
• The charging station can be removed as
needed. To remove it, hold the floor stand
dock steady and pull up on the charging
station.
6
Connect the power adapter h to the port on
the back of the charging station.
7
Drill a hole and insert the drywall anchor i.
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
• For drywall anchor: use 6.5 mm drill bit
• Recommended diameter of hole: 6.5 mm
• Recommended depth: 60 mm
• If screwing into drywall, the drywall anchor
should be used.
EN
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cordzero a9essential

Table of Contents