Commissioning Process - Huawei OptiX RTN 950A Quick Installation Manual

Radio transmission system
Hide thumbs Also See for OptiX RTN 950A:
Table of Contents

Advertisement

Commissioning Process

Page 36
Start
Powering On the
Page 35
Equipment
Configuring the NE
Data (by Using the
USB Flash Drive)
Pages
Aligning the
38 to 40
Antennas
Checking the Radio
Page 40
Link Status
End
Configuring the NE
Data (by Using the
Page 37
Web LCT / Hand-
Pages
38 to 39
Pages
39 to 40
1
Held Tool)
Aligning the Single-
Polarized Antennas
Aligning the Dual-
Polarized Antennas

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r010

Table of Contents