Preparation And Termination Processings; Preparation; Termination Processing (Steps After Welding Operation) - Panasonic YD-500GP5 Operating Instructions Manual

Digital igbt control mig/mag power source
Table of Contents

Advertisement

7 Preparation and termination processings

7.1 Preparation

 Use of protective equipment
Welding operations in narrow spaces may cause asphyxia due to lack of oxygen.
Prepare ventilation facilities to prevent the inhalation of gases and fumes generated
during the welding operation. Otherwise, wear a respirator.
Wear leather gloves and safety shoes to protect the exposed
parts of your eyes and skin.
Prepare light-shielding glasses or a welding face-shield with a
light- shielding filter plate appropriate to the applied welding
current.
-operation check
Pre
Check if all connections are correct and complete.
Check if settings of the switches on the P.C. Board are correct
Check if wire is set to the wire feeder.
on power
Turning
Turn of the power to the distribution box.
Turn on the POWER switch of this product.

7.2 Termination processing (steps after welding operation)

Shutting off gas
Close the main valve of the gas bottle.
Perform the "gas purge" to take the residual pressure out of the pipe.
Shutting off power
Important
Turn off "POWER" switch.
Turn off the power to the distribution box.
Preparation and termination processings
To protect you and other people from gases, fumes and lack of oxygen
that may be generated during the welding operation, make sure to prepare
ventilation facilities and use protective equipment, etc.
To protect you and other people from arc light, flying
spatters, slag, and arc noises generated by welding,
use protective equipment.
To allow the inside of this product to cool down, turn the power off at least 5
minutes after the completion of welding operations.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents