NEC N8100-1983F User Manual page 116

Table of Contents

Advertisement

Chapter 3 Setup
Category
UPS
When the server is supplied
Powerlink
with power from UPS, always
turn on the power.
If the server is turned off by
using POWER switch, leave it
OFF even when UPS supplies
power.
Keep the power OFF even
when UPS supplies power.
116
Description
Server → Power Control
Configuration → AC-LINK → Power
On
Server → Power Control
Configuration → AC-LINK → Last
State
Server → Power Control
Configuration → AC-LINK → Stay off
Express5800/T110f-S User's Guide
To be changed
2. System BIOS Setup
Remark

Advertisement

Table of Contents
loading

Table of Contents