Mitsubishi Electric BDT CITY MULTI Installation And Pre-Commissioning Booklet page 2

Table of Contents

Advertisement

This document is designed to outline BDT's installation
and pre-commissioning expectations and in turn provide
a guide to ensure that an effective commissioning process
can be undertaken to minimise potential delays. It is
recommended that both the project manager and the onsite
supervisor/manager familiarise themselves with these
guidelines prior to calling BDT staff out to commence the
actual commissioning process on-site.
If BDT attends site to commission the new system and
find that the pre-commissioning expectations have not
been met as per the guidelines outlined in this document;
BDT reserves the right to leave site to attend to other
commitments and return once the pre-commissioning
expectations have been completed.
If the installer is unable to complete the pre-commissioning
process, BDT also reserves the right to submit charges to
cover our costs of returning to site and/or assisting with
bringing the system up to a commissionable standard.
These costs may include additional flights, accommodation,
travel time, parts and labour onsite. These charges are
additional to the actual commissioning cost charged at the
time of purchase of the product. Labour charges will be set
at $75.00 + GST per hour.
This booklet has been prepared on the basis of the latest
product and system specifications at the time of booklet
publication. It is intended as a guide and should not be
relied upon when designing system installations. From time
to time models, dimensions and specifications change so
differences may exist between the content of this manual
and final product specifications.
Always check the BDT website or contact Technical Services
on (0800 163 526) to confirm current product data before
carrying out any prescribed work.
The contents and instructions within this booklet do not
in any way negate local bylaws or New Zealand standards
and regulations, nor does it remove the requirement for
installers and/or service persons to be suitably qualified
to legitimately carry out the prescribed work. Please always
confirm and comply with your local regulations before
carrying out any prescribed installation or service work.
Statement of Confidentiality
All content included in this document is the property
of Black Diamond Technologies Limited and Mitsubishi
Electric Corporation Japan. Parts of this information are
protected by international copyright laws. This information
must remain confidential and may not be reproduced,
modified, republished, distributed, transmitted, displayed,
broadcast or otherwise exploited in any manner without
the express prior written permission of BDT. This document
has been designed, and can only be used as a guide and
as a singular reference tool for the Mitsubishi Electric City
Multi installation project that it was intended for.
As this publication is intended as a guide and is
considered reference material, in no event will Black
Diamond Technologies Limited be held liable for any
damages including, without limitation, direct, indirect,
special, incidental, consequential or punitive damages or
expenses arising for the misinterpretation/misapplication
of the recommended practices outlined herein.

Advertisement

Table of Contents
loading

This manual is also suitable for:

P200P250Ep200Ep250P300P350 ... Show all

Table of Contents