Function Check; Functional Test Cable Winder; Functional Tests With Motor Drive; Speed Adjustment (If Necessary) - Siemens MOBILETT Plus HP Installation And Setting Instructions Manual

Table of Contents

Advertisement

2 - 4

Function check

If a maIfunction occurs a message is indicated at the display, see "Service Instructions,
chapter Display messages".

Functional test cable winder

Disconnect the power supply plug.
Pull the left handle (for the cable winder) upwards.
Move the cable up and down while rewinding it, in order to avoid any slack, until the cable
is completely rolled up. Check proper function of cable winder and brake.
Pull out the cable and connect the power supply plug.

Functional tests with motor drive

Test the forward/ reverse and fast (1 m/s) / slow (0.5 m/s) controls.
NOTE

Speed Adjustment (if necessary)

Remove the plastic plug above and to the left of the supporting wheels on the cover with
the cassette compartment (for details see the Service Instructions).
Use a screwdriver and adjust the speed by potentiometer on D101:
- turn clockwise (CW) for slower speed.
- turn counterclockwise (CCW) for faster speed.
NOTE
MOBILETT Plus HP
For adjustment, see chapter "Speed Adjustment".
This will effect the slow/fast speed simultaneously.
SPR8-220.033.03
Rev. 02
Installation and setting
Page 4 of 12
10.02
SPS-UD
2
2
2
2
Siemens-Elema AB
Solna, Sweden

Advertisement

Table of Contents
loading

Table of Contents