Check The Light Field To X-Ray Field; Measurement Of Protective Ground Wire - Siemens MOBILETT Plus HP Installation And Setting Instructions Manual

Table of Contents

Advertisement

2 - 10

Check the light field to X-ray field

NOTE
Load a 35x35 cm (14"x14") cassette with film.
Put the cassette on a table or a similar repository.
Set a SID of 100 cm (39"). Use the measuring tape.
Switch on the collimator lamp and align the cassette. Now, collimate the light field to
25 x 25 cm (10"x10").
Mark the four corners with coins and mark one of the corners with two coins, see Fig. 7.
Set 52 kV, 2.0 mAs on the Control and display panel.
Trigger an exposure.
Fig. 8
Process the film and measure the deviation between the light field and the X-ray field.
Permissible deviation ±1.7 % of the SID, see Fig. 8.
If the deviation is greater, see "Service Instructions, chapter Replacement and repairs on
the collimator".

Measurement of protective ground wire

Measuring instruments required: test instrument for protective ground wire
Measure protective ground wire according to ARTD-002.731.17... "Safety regulations for
installation and maintenance".
Resistance of protective ground wire ≤ 0.2 ohms.
MOBILETT Plus HP
If the MOBILETT is equipped with a DAP measuring system;
Remove the DAP ionization chamber first.
SPR8-220.033.03
Rev. 02
Installation and setting
A+C
< 1,7 %
SID
B+D
< 1,7 %
SID
= Light field
- - - - - - - -
________
= X-ray field
SID = Source image distance
Page 10 of 12
10.02
SPS-UD
2
2
Siemens-Elema AB
Solna, Sweden

Advertisement

Table of Contents
loading

Table of Contents