Figure 5.6: Stage 3: Left Tower Drying, Right Tower Purging
Figure 5.6: Stage 3: Left Tower Drying, Right Tower Purging
The right solenoid is energized allowing air on the outside of the diaphragm to vent through the solenoid valve to atmosphere. As air pressure on the outside of the
diaphragm drops, the diaphragm is pushed away from the valve seat by the internal air pressure of the dryer and air rushes out the silencer as the left tower depressuriz-
es.
The shuttle valves move to the lower pressure (right) side and seal off against the main process flow.
Once the tower pressure drops, dry, purge air passes from the outlet of the left tower into the top of the right tower via the purge orifice. The air then flows down through
the right desiccant bed evacuating the trapped moisture and venting it to atmosphere.