Section 4
Starting up
IEC13000060 V1 EN-US
Figure 6:
5.
Select Use the following IP address and define IP address and Subnet mask if the front port is
used and if the IP address is not set to be obtained automatically by the IED,see
IP address must be different from the IP address chosen for the IED.
IEC13000062 V1 EN-US
Figure 7:
6.
Use the ping command to verify connectivity with the IED.
7.
Close all open windows and start PCM600.
44
IEC13000060-1-en.vsd
Select the TCP/IPv4 protocol and open Properties
Select: Use the following IP address
The PC and IED must belong to the same subnetwork for this set-up to work.
© 2017 - 2022 Hitachi Energy. All rights reserved
IEC13000062-1-en.vsd
1MRK 511 403-UEN Rev. L
Figure
7. The
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents