Section 5
Configuring the IED and changing settings..............................................49
5.1
Overview............................................................................................................................. 49
5.2
Configuring analog CT inputs..............................................................................................49
5.3
Supervision of input/output modules................................................................................... 50
Section 6
6.1
Entering settings..................................................................................................................51
6.1.1
Entering SPA settings........................................................................................................51
6.1.2
Entering IEC settings.........................................................................................................51
6.2
Verifying the communication............................................................................................... 51
6.2.1
Verifying SPA communication........................................................................................... 52
6.2.2
Verifying IEC communication............................................................................................ 52
6.3
Fiber optic loop....................................................................................................................52
6.4
Section 7
7.1
Communication via the rear ports ...................................................................................... 55
7.1.1
LON communication..........................................................................................................55
7.1.2
The LON Protocol..............................................................................................................56
7.1.3
Hardware and software modules.......................................................................................56
7.2
Optical budget calculation for serial communication with LON .......................................... 57
Section 8
8.1
Overview............................................................................................................................. 59
8.2
Setting the station communication...................................................................................... 59
8.3
Verifying the communication .............................................................................................. 59
Section 9
communication............................................................................................ 61
9.1
Overview............................................................................................................................. 61
9.2
Setting the PMU station communication (PMU Report)...................................................... 61
9.3
Setting the PMU station communication (PMU configuration)............................................ 61
9.4
Setting the TCP/UDP client communication........................................................................62
9.5
Verifying the communication............................................................................................... 65
9.5.1
Verifying the IEEE C37.118/1344 TCP communication.....................................................65
9.5.2
Verifying the IEEE C37.118/1344 UDP communication.................................................... 71
9.6
Optical budget calculation for PMU - PDC communication................................................. 72
Section 10
Testing IED operation..................................................................................73
10.1
Preparing for test.................................................................................................................73
10.1.1
Requirements....................................................................................................................73
10.1.2
Preparing the IED to verify settings...................................................................................74
10.2
Activating the test mode...................................................................................................... 75
10.3
Preparing the connection to the test equipment..................................................................75
10.4
Connecting the test equipment to the IED...........................................................................76
10.5
Releasing the function to be tested..................................................................................... 76
10.6
Verifying analog primary and secondary measurement...................................................... 77
2
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 511 403-UEN Rev. L
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents